Construction Update - April 26, 2024
File Construction and Alderman Electric were onsite this week to install the control panel for the new lift station and begin construction of the shade structure. The plan last week was to perform the cut over from the old to the new system, but it may not happen as PNM has to approve and connect the new electrical boxes. The new variable frequency drive (VDR) system in the control panel is air conditioned, which will help extend the VDRs life.